Build sandwiches and bonded assemblies deliberately
Generated from
content/lms/fabrication-and-composites/05-build-sandwiches-and-bonded-assemblies/module.md; edit the source file, not this page.
Source path: content/lms/fabrication-and-composites/05-build-sandwiches-and-bonded-assemblies/module.md
Course: Fabricate composite race-car parts with workshop discipline
Estimated duration: 60 minutes
Module Overview
Use pre-pregs, cores, film adhesive, reinforcements, and subassembly bonding without overreaching into certified structures.
Lessons
- Qualify the pre-preg job before you commit - 55 minutes
- Heat the cure with controlled air - 55 minutes
- Choose the core for the loads it must survive - 55 minutes
- Bond every interface as a load path - 45 minutes
- Build stiffness without brittleness - 45 minutes